Kanjari Boriyavi Junction – Vadtal Swaminarayan
Kanjari Boriyavi Junction – Vadtal Swaminarayan (KBRV–VTL) railway line: 6 km, single diesel broad gauge. 2 stations, Western Railway.
- Length
- 6 km
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- DieselNo overhead wires, so trains are hauled by diesel engines.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- Kanjari Boriyavi Jn KBRV 0.0 km
- Vadtal Swaminarayan VTL 6.1 km
Quick answers
How long is the Kanjari Boriyavi Junction – Vadtal Swaminarayan line?
The Kanjari Boriyavi Junction – Vadtal Swaminarayan line is about 6 km long, with 2 stations.
Is the Kanjari Boriyavi Junction – Vadtal Swaminarayan line electrified?
No. The Kanjari Boriyavi Junction – Vadtal Swaminarayan line is not electrified: trains use diesel engines.
Is Kanjari Boriyavi Junction – Vadtal Swaminarayan a single or double line?
The Kanjari Boriyavi Junction – Vadtal Swaminarayan line is a single line. Trains in both directions share one track and wait at stations to cross.