Kanpur Central – Kanpur Bridge Left Bank
Kanpur Central – Kanpur Bridge Left Bank (CNB–CPB) railway line: 4 km, double electric broad gauge. 4 stations and 219 trains, North Central Railway.
- Length
- 4 km
- Speed limit
- 110 km/h
- Trains
- 219 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 4
- Kanpur Ctrl CNB 0.0 km
- Kanpur Bridge Left Bank CPB 3.9 km
- Magarwara MGW 11.3 km
- Unnao Jn ON 17.6 km
Quick answers
How long is the Kanpur Central – Kanpur Bridge Left Bank line?
The Kanpur Central – Kanpur Bridge Left Bank line is about 4 km long, with 4 stations.
Is the Kanpur Central – Kanpur Bridge Left Bank line electrified?
Yes. The Kanpur Central – Kanpur Bridge Left Bank line is electrified: trains run on electric power from overhead wires.
Is Kanpur Central – Kanpur Bridge Left Bank a single or double line?
The Kanpur Central – Kanpur Bridge Left Bank line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Kanpur Central and Kanpur Bridge Left Bank?
Trains can run at up to 110 km/h between Kanpur Central and Kanpur Bridge Left Bank.
How many trains use the Kanpur Central – Kanpur Bridge Left Bank line?
219 trains run over the Kanpur Central – Kanpur Bridge Left Bank line.