Kendujhargarh – Badampahar
Kendujhargarh – Badampahar (KDJR–BMPR) railway line: 82 km, single broad gauge. 8 stations, East Coast Railway.
- Length
- 82 km
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- New LineThis is a new line under construction.
Stations on this line · 8
- Kendujhargarh KDJR 0.0 km
- KHTGR KHTGR 17.3 km
- CHMN CHMN 25.6 km
- GSDD GSDD 35.9 km
- SNGD SNGD 50.3 km
- TNGBH TNGBH 59.0 km
- KLSBNH KLSBNH 71.6 km
- Badampahar BMPR 81.9 km
Quick answers
How long is the Kendujhargarh – Badampahar line?
The Kendujhargarh – Badampahar line is about 82 km long, with 8 stations.
Is Kendujhargarh – Badampahar a single or double line?
The Kendujhargarh – Badampahar line is a single line. Trains in both directions share one track and wait at stations to cross.