RailTribe
Lines
Map
Trains
Line

Khajuraho Bypass A Cabin – Birari

Khajuraho Bypass A Cabin – Birari (YY-KURA–BRRI) railway line: 146 km, single electric broad gauge. 16 stations and 16 trains, North Central Railway.

Length
146 km
Speed limit
110 km/h
Trains
16 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 16

  1. Khajuraho Jn KURJ 0.0 km
  2. YY-KURA YY-KURA 3.5 km
  3. Duriya Ganj DAYG 11.6 km
  4. Basari BSRI 20.0 km
  5. MCRS Chhatarpur MCSC 31.4 km
  6. Ishanagar ISHN 56.0 km
  7. Rampur RAPU 60.5 km
  8. Tila TILA 67.9 km
  9. Khargapur KHGP 78.2 km
  10. Sarkanpur SKNP 90.7 km
  11. Mawai MWAI 103.9 km
  12. Tikamgarh TKMG 114.4 km
  13. Udaipura UDPR 133.9 km
  14. Birari BRRI 149.9 km
  15. New Lalitpur Town NLRT 159.2 km
  16. Lalitpur Jn LAR 165.8 km

Quick answers

How long is the Khajuraho Bypass A Cabin – Birari line?

The Khajuraho Bypass A Cabin – Birari line is about 146 km long, with 16 stations.

Is the Khajuraho Bypass A Cabin – Birari line electrified?

Yes. The Khajuraho Bypass A Cabin – Birari line is electrified: trains run on electric power from overhead wires.

Is Khajuraho Bypass A Cabin – Birari a single or double line?

The Khajuraho Bypass A Cabin – Birari line is a single line. Trains in both directions share one track and wait at stations to cross.

What is the speed limit between Khajuraho Bypass A Cabin and Birari?

Trains can run at up to 110 km/h between Khajuraho Bypass A Cabin and Birari.

How many trains use the Khajuraho Bypass A Cabin – Birari line?

16 trains run over the Khajuraho Bypass A Cabin – Birari line.

Indian railway atlas