Khajuraho Junction – Khajuraho Bypass A Cabin
Khajuraho Junction – Khajuraho Bypass A Cabin (KURJ–YY-KURA) railway line: 4 km, single electric broad gauge. 16 stations and 16 trains, North Central Railway.
- Length
- 4 km
- Trains
- 16 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 16
- Khajuraho Jn KURJ 0.0 km
- YY-KURA YY-KURA 3.5 km
- Duriya Ganj DAYG 11.6 km
- Basari BSRI 20.0 km
- MCRS Chhatarpur MCSC 31.4 km
- Ishanagar ISHN 56.0 km
- Rampur RAPU 60.5 km
- Tila TILA 67.9 km
- Khargapur KHGP 78.2 km
- Sarkanpur SKNP 90.7 km
- Mawai MWAI 103.9 km
- Tikamgarh TKMG 114.4 km
- Udaipura UDPR 133.9 km
- Birari BRRI 149.9 km
- New Lalitpur Town NLRT 159.2 km
- Lalitpur Jn LAR 165.8 km
Quick answers
How long is the Khajuraho Junction – Khajuraho Bypass A Cabin line?
The Khajuraho Junction – Khajuraho Bypass A Cabin line is about 4 km long, with 16 stations.
Is the Khajuraho Junction – Khajuraho Bypass A Cabin line electrified?
Yes. The Khajuraho Junction – Khajuraho Bypass A Cabin line is electrified: trains run on electric power from overhead wires.
Is Khajuraho Junction – Khajuraho Bypass A Cabin a single or double line?
The Khajuraho Junction – Khajuraho Bypass A Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Khajuraho Junction – Khajuraho Bypass A Cabin line?
16 trains run over the Khajuraho Junction – Khajuraho Bypass A Cabin line.