Kund – Ateli
Kund – Ateli (KUND–AEL) railway line: 15 km, double electric broad gauge. 19 stations and 28 trains, North Western Railway.
- Length
- 15 km
- Trains
- 28 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 19
- Rewari Jn RE 0.0 km
- Khori KORI 10.9 km
- Pali PALI 16.3 km
- Kund KUND 23.0 km
- Kathuwas KTWS 28.0 km
- Ateli AEL 37.6 km
- Mirzapur Bachhaud MBV 44.5 km
- Narnaul NNL 51.9 km
- Amarpur Jorasi APJ 59.7 km
- Nizampur NIP 66.1 km
- Dabla DBLA 77.3 km
- Jhilo JLLO 85.0 km
- Maonda MADA 92.5 km
- Nim Ka Thana NMK 101.8 km
- Bhagega BAGA 111.0 km
- Kanwat KAWT 122.3 km
- Kachera KHRA 129.3 km
- Shri Madhopur SMPR 138.7 km
- Ringas Jn RGS 148.7 km
Quick answers
How long is the Kund – Ateli line?
The Kund – Ateli line is about 15 km long, with 19 stations.
Is the Kund – Ateli line electrified?
Yes. The Kund – Ateli line is electrified: trains run on electric power from overhead wires.
Is Kund – Ateli a single or double line?
The Kund – Ateli line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the Kund – Ateli line?
28 trains run over the Kund – Ateli line.