RailTribe
Lines
Map
Trains
Line

Lalgarh Bypass Cabin – Suratgarh Junction

Lalgarh Bypass Cabin – Suratgarh Junction (XX-LGHB–SOG) railway line: 175 km, single electric broad gauge. 17 stations and 36 trains, North Western Railway.

Length
175 km
Speed limit
110 km/h
Trains
36 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 17

  1. XX-LGHB XX-LGHB 0.0 km
  2. Kanasar KNSR 9.7 km
  3. Jamsar JMS 23.4 km
  4. Jagdevwala JDL 34.2 km
  5. Baman Wali Halt BMNL 43.3 km
  6. Dhirera DHRR 50.3 km
  7. Dulmera DLC 60.0 km
  8. Lunkaransar LKS 73.2 km
  9. Nathwana NTZ 84.1 km
  10. Malkisar MLC 95.0 km
  11. Mahajan MHJ 112.9 km
  12. Arjansar AS 128.9 km
  13. Rajiyasar RJS 144.4 km
  14. XX-BDWO XX-BDWO 155.6 km
  15. Biradhwal BDWL 157.6 km
  16. Piperan PPRN 168.4 km
  17. Suratgarh Jn SOG 175.5 km

Quick answers

How long is the Lalgarh Bypass Cabin – Suratgarh Junction line?

The Lalgarh Bypass Cabin – Suratgarh Junction line is about 175 km long, with 17 stations.

Is the Lalgarh Bypass Cabin – Suratgarh Junction line electrified?

Yes. The Lalgarh Bypass Cabin – Suratgarh Junction line is electrified: trains run on electric power from overhead wires.

Is Lalgarh Bypass Cabin – Suratgarh Junction a single or double line?

The Lalgarh Bypass Cabin – Suratgarh Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

What is the speed limit between Lalgarh Bypass Cabin and Suratgarh Junction?

Trains can run at up to 110 km/h between Lalgarh Bypass Cabin and Suratgarh Junction.

How many trains use the Lalgarh Bypass Cabin – Suratgarh Junction line?

36 trains run over the Lalgarh Bypass Cabin – Suratgarh Junction line.

Indian railway atlas