Lalgola – Murshidabad Junction
Lalgola – Murshidabad Junction (LGL–MBB) railway line: 31 km, double electric broad gauge. 8 stations and 35 trains, Eastern Railway.
- Length
- 31 km
- Speed limit
- 110 km/h
- Trains
- 35 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 8
- Lalgola LGL 0.0 km
- Krishnapur KRP 1.7 km
- Pirtala PRTL 7.5 km
- Bhagwangola BQG 11.5 km
- Subarnamrigi SBNM 18.2 km
- Jiaganj JJG 22.9 km
- Nashipur Road NSO 26.3 km
- Murshidabad Jn MBB 30.6 km
Quick answers
How long is the Lalgola – Murshidabad Junction line?
The Lalgola – Murshidabad Junction line is about 31 km long, with 8 stations.
Is the Lalgola – Murshidabad Junction line electrified?
Yes. The Lalgola – Murshidabad Junction line is electrified: trains run on electric power from overhead wires.
Is Lalgola – Murshidabad Junction a single or double line?
The Lalgola – Murshidabad Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Lalgola and Murshidabad Junction?
Trains can run at up to 110 km/h between Lalgola and Murshidabad Junction.
How many trains use the Lalgola – Murshidabad Junction line?
35 trains run over the Lalgola – Murshidabad Junction line.