Lar Road – Salempur Junction
Lar Road – Salempur Junction (LRD–SRU) railway line: 10 km, double electric broad gauge. 9 stations and 50 trains, North Eastern Railway.
- Length
- 10 km
- Speed limit
- 110 km/h
- Trains
- 50 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 9
- Indara Jn IAA 0.0 km
- XX-IAAO XX-IAAO 0.9 km
- Chakra Road CKYD 5.6 km
- Kiriharapur KER 13.5 km
- Gobindpur Dugauli Halt GOX 20.0 km
- Belthara Road BLTR 27.1 km
- Turtipar TTI 33.9 km
- Lar Road LRD 40.1 km
- Salempur Jn SRU 49.6 km
Quick answers
How long is the Lar Road – Salempur Junction line?
The Lar Road – Salempur Junction line is about 10 km long, with 9 stations.
Is the Lar Road – Salempur Junction line electrified?
Yes. The Lar Road – Salempur Junction line is electrified: trains run on electric power from overhead wires.
Is Lar Road – Salempur Junction a single or double line?
The Lar Road – Salempur Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Lar Road and Salempur Junction?
Trains can run at up to 110 km/h between Lar Road and Salempur Junction.
How many trains use the Lar Road – Salempur Junction line?
50 trains run over the Lar Road – Salempur Junction line.