Ledo – Tirap Siding
Ledo – Tirap Siding (LEDO–TPWF) railway line: 4 km, single diesel broad gauge. 10 stations, Northeast Frontier Railway.
- Length
- 4 km
- Speed limit
- 40 km/h
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- DieselNo overhead wires, so trains are hauled by diesel engines.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- ElectrificationOverhead wires are being installed.
Stations on this line · 10
- Makum Jn MJN 0.0 km
- Tingrai TII 12.4 km
- Bogapani BGPI 18.3 km
- Digboi DBY 25.6 km
- Powai PWA 30.2 km
- Margherita MRG 38.1 km
- Bargolai BGLI 41.9 km
- Ledo LEDO 45.4 km
- Tirap Siding TPWF 49.2 km
- Lekhapani LKPE 54.5 km
Quick answers
How long is the Ledo – Tirap Siding line?
The Ledo – Tirap Siding line is about 4 km long, with 10 stations.
Is the Ledo – Tirap Siding line electrified?
No. The Ledo – Tirap Siding line is not electrified: trains use diesel engines.
Is Ledo – Tirap Siding a single or double line?
The Ledo – Tirap Siding line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Ledo and Tirap Siding?
Trains can run at up to 40 km/h between Ledo and Tirap Siding.