RailTribe
Lines
Map
Trains
Line

Lumding Junction – Furkating Junction

Lumding Junction – Furkating Junction (LMG–FKG) railway line: 140 km, single electric broad gauge. 21 stations and 42 trains, Northeast Frontier Railway.

Length
140 km
Trains
42 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 21

  1. Lumding Jn LMG 0.0 km
  2. Barlangfer BRLF 6.9 km
  3. Langcholiet LCT 13.5 km
  4. Nailalung NLN 23.1 km
  5. Diphu DPU 32.5 km
  6. Daldali DLDE 42.4 km
  7. Dhansiri Jn DSR 51.3 km
  8. Rangapahar RXR 58.2 km
  9. Rangapahar Crossing RXRX 63.4 km
  10. FCI Siding Dimapur DMFS 69.1 km
  11. Dimapur DMV 69.6 km
  12. Khotkhoti KHKT 75.6 km
  13. Bokajan BXJ 83.8 km
  14. Chongajan CJA 89.8 km
  15. Naojan NJN 97.4 km
  16. Sarupathar SZR 105.8 km
  17. Barpathar BXP 115.3 km
  18. Bhilgaon BHGN 123.2 km
  19. Jamguri JMI 129.9 km
  20. Oating OTN 135.6 km
  21. Furkating Jn FKG 139.7 km

Quick answers

How long is the Lumding Junction – Furkating Junction line?

The Lumding Junction – Furkating Junction line is about 140 km long, with 21 stations.

Is the Lumding Junction – Furkating Junction line electrified?

Yes. The Lumding Junction – Furkating Junction line is electrified: trains run on electric power from overhead wires.

Is Lumding Junction – Furkating Junction a single or double line?

The Lumding Junction – Furkating Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Lumding Junction – Furkating Junction line?

42 trains run over the Lumding Junction – Furkating Junction line.

Indian railway atlas