Mahesana Junction – Palanpur Junction
Mahesana Junction – Palanpur Junction (MSH–PNU) railway line: 67 km, double electric broad gauge. 10 stations and 120 trains, Western Railway.
- Length
- 67 km
- Trains
- 120 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 10
- Mahesana Jn MSH 0.0 km
- Bhandu Motidau BHU 10.0 km
- Unawa Aithor UAR 16.8 km
- Unjha UJA 22.6 km
- Kamli KMLI 31.2 km
- Siddhpur SID 37.5 km
- Dharewada DRW 43.1 km
- Chhapi CHP 50.7 km
- Umardashi UM 58.5 km
- Palanpur Jn PNU 66.9 km
Quick answers
How long is the Mahesana Junction – Palanpur Junction line?
The Mahesana Junction – Palanpur Junction line is about 67 km long, with 10 stations.
Is the Mahesana Junction – Palanpur Junction line electrified?
Yes. The Mahesana Junction – Palanpur Junction line is electrified: trains run on electric power from overhead wires.
Is Mahesana Junction – Palanpur Junction a single or double line?
The Mahesana Junction – Palanpur Junction line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the Mahesana Junction – Palanpur Junction line?
120 trains run over the Mahesana Junction – Palanpur Junction line.