Mahuda Junction – Bhojudih Junction
Mahuda Junction – Bhojudih Junction (MHQ–BJE) railway line: 23 km, single electric broad gauge. 5 stations and 22 trains, South Eastern Railway.
- Length
- 23 km
- Speed limit
- 110 km/h
- Trains
- 22 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 5
- Mahuda Jn MHQ 0.0 km
- XX-TLEB XX-TLEB 8.4 km
- Talgaria TLE 10.7 km
- Shewbabudih SBW 16.8 km
- Bhojudih Jn BJE 22.9 km
Quick answers
How long is the Mahuda Junction – Bhojudih Junction line?
The Mahuda Junction – Bhojudih Junction line is about 23 km long, with 5 stations.
Is the Mahuda Junction – Bhojudih Junction line electrified?
Yes. The Mahuda Junction – Bhojudih Junction line is electrified: trains run on electric power from overhead wires.
Is Mahuda Junction – Bhojudih Junction a single or double line?
The Mahuda Junction – Bhojudih Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Mahuda Junction and Bhojudih Junction?
Trains can run at up to 110 km/h between Mahuda Junction and Bhojudih Junction.
How many trains use the Mahuda Junction – Bhojudih Junction line?
22 trains run over the Mahuda Junction – Bhojudih Junction line.