Mangaluru Central – Nethravathi Cabin
Mangaluru Central – Nethravathi Cabin (MAQ–NTVT) railway line: 3 km, double electric broad gauge. 2 stations and 40 trains, South Western Railway.
- Length
- 3 km
- Speed limit
- 55 km/h
- Trains
- 40 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 2
- Mangaluru Ctrl MAQ 0.0 km
- Nethravathi Cabin NTVT 2.6 km
Quick answers
How long is the Mangaluru Central – Nethravathi Cabin line?
The Mangaluru Central – Nethravathi Cabin line is about 3 km long, with 2 stations.
Is the Mangaluru Central – Nethravathi Cabin line electrified?
Yes. The Mangaluru Central – Nethravathi Cabin line is electrified: trains run on electric power from overhead wires.
Is Mangaluru Central – Nethravathi Cabin a single or double line?
The Mangaluru Central – Nethravathi Cabin line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Mangaluru Central and Nethravathi Cabin?
Trains can run at up to 55 km/h between Mangaluru Central and Nethravathi Cabin.
How many trains use the Mangaluru Central – Nethravathi Cabin line?
40 trains run over the Mangaluru Central – Nethravathi Cabin line.