RailTribe
Lines
Map
Trains
Line

Mettur Thermal Power Plant Siding – Mecheri Road

Mettur Thermal Power Plant Siding – Mecheri Road (MTPPS–MCRD) railway line: 16 km, single electric broad gauge. 5 stations and 2 trains, Southern Railway.

Length
16 km
Trains
2 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 5

  1. Mettur Thermal Power Plant Siding MTPPS 0.0 km
  2. PAZHT PAZHT 11.4 km
  3. Chinna Koothanur CHKTR 12.7 km
  4. VIRUD VIRUD 14.0 km
  5. Mecheri Road MCRD 16.4 km

Quick answers

How long is the Mettur Thermal Power Plant Siding – Mecheri Road line?

The Mettur Thermal Power Plant Siding – Mecheri Road line is about 16 km long, with 5 stations.

Is the Mettur Thermal Power Plant Siding – Mecheri Road line electrified?

Yes. The Mettur Thermal Power Plant Siding – Mecheri Road line is electrified: trains run on electric power from overhead wires.

Is Mettur Thermal Power Plant Siding – Mecheri Road a single or double line?

The Mettur Thermal Power Plant Siding – Mecheri Road line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Mettur Thermal Power Plant Siding – Mecheri Road line?

2 trains run over the Mettur Thermal Power Plant Siding – Mecheri Road line.

Indian railway atlas