Mettur Thermal Power Plant Siding – Mecheri Road
Mettur Thermal Power Plant Siding – Mecheri Road (MTPPS–MCRD) railway line: 16 km, single electric broad gauge. 5 stations and 2 trains, Southern Railway.
- Length
- 16 km
- Trains
- 2 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 5
- Mettur Thermal Power Plant Siding MTPPS 0.0 km
- PAZHT PAZHT 11.4 km
- Chinna Koothanur CHKTR 12.7 km
- VIRUD VIRUD 14.0 km
- Mecheri Road MCRD 16.4 km
Quick answers
How long is the Mettur Thermal Power Plant Siding – Mecheri Road line?
The Mettur Thermal Power Plant Siding – Mecheri Road line is about 16 km long, with 5 stations.
Is the Mettur Thermal Power Plant Siding – Mecheri Road line electrified?
Yes. The Mettur Thermal Power Plant Siding – Mecheri Road line is electrified: trains run on electric power from overhead wires.
Is Mettur Thermal Power Plant Siding – Mecheri Road a single or double line?
The Mettur Thermal Power Plant Siding – Mecheri Road line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Mettur Thermal Power Plant Siding – Mecheri Road line?
2 trains run over the Mettur Thermal Power Plant Siding – Mecheri Road line.