Morena – Birlanagar Junction
Morena – Birlanagar Junction (MRA–BLNR) railway line: 36 km, triple electric broad gauge. 10 stations and 209 trains, North Central Railway.
- Length
- 36 km
- Speed limit
- 130 km/h
- Trains
- 209 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Triple lineAn extra track that lets more trains run.
Stations on this line · 10
- Dholpur Jn DHO 0.0 km
- GHER GHER 5.7 km
- Hetampur HET 13.1 km
- Sikroda Kwanri SIKD 18.8 km
- Morena MRA 27.0 km
- Sank SANK 36.7 km
- Nurabad NUB 40.2 km
- Banmor BAO 46.2 km
- Rayaru RRU 52.6 km
- Birlanagar Jn BLNR 62.8 km
Quick answers
How long is the Morena – Birlanagar Junction line?
The Morena – Birlanagar Junction line is about 36 km long, with 10 stations.
Is the Morena – Birlanagar Junction line electrified?
Yes. The Morena – Birlanagar Junction line is electrified: trains run on electric power from overhead wires.
Is Morena – Birlanagar Junction a single or double line?
The Morena – Birlanagar Junction line is a triple line. An extra track that lets more trains run.
What is the speed limit between Morena and Birlanagar Junction?
Trains can run at up to 130 km/h between Morena and Birlanagar Junction.
How many trains use the Morena – Birlanagar Junction line?
209 trains run over the Morena – Birlanagar Junction line.