Moula Ali Bypass Cabin – Moula Ali G Cabin
Moula Ali Bypass Cabin – Moula Ali G Cabin (YY-MLYB–MLYG) railway line: 1 km, single electric broad gauge. 2 stations and 40 trains, South Central Railway.
- Length
- 1 km
- Trains
- 40 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- YY-MLYB YY-MLYB 0.0 km
- Moula Ali G Cabin MLYG 1.4 km
Quick answers
How long is the Moula Ali Bypass Cabin – Moula Ali G Cabin line?
The Moula Ali Bypass Cabin – Moula Ali G Cabin line is about 1 km long, with 2 stations.
Is the Moula Ali Bypass Cabin – Moula Ali G Cabin line electrified?
Yes. The Moula Ali Bypass Cabin – Moula Ali G Cabin line is electrified: trains run on electric power from overhead wires.
Is Moula Ali Bypass Cabin – Moula Ali G Cabin a single or double line?
The Moula Ali Bypass Cabin – Moula Ali G Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Moula Ali Bypass Cabin – Moula Ali G Cabin line?
40 trains run over the Moula Ali Bypass Cabin – Moula Ali G Cabin line.