Moula Ali C Cabin – Ghatkesar
Moula Ali C Cabin – Ghatkesar (MLYC–GT) railway line: 12 km, quadruple electric broad gauge. 5 stations and 211 trains, South Central Railway.
- Length
- 12 km
- Trains
- 211 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Quadruple lineTwo tracks each way, found on the busiest routes.
Stations on this line · 5
- Moula Ali C Cabin MLYC 0.0 km
- Charlapalli CHZ 3.7 km
- Ghatkesar GT 11.6 km
- Bibinagar BN 24.4 km
- Pagidipalli Jn PGDP 27.7 km
Quick answers
How long is the Moula Ali C Cabin – Ghatkesar line?
The Moula Ali C Cabin – Ghatkesar line is about 12 km long, with 5 stations.
Is the Moula Ali C Cabin – Ghatkesar line electrified?
Yes. The Moula Ali C Cabin – Ghatkesar line is electrified: trains run on electric power from overhead wires.
Is Moula Ali C Cabin – Ghatkesar a single or double line?
The Moula Ali C Cabin – Ghatkesar line is a quadruple line. Two tracks each way, found on the busiest routes.
How many trains use the Moula Ali C Cabin – Ghatkesar line?
211 trains run over the Moula Ali C Cabin – Ghatkesar line.