Muazzampur Narayan Junction – Najibabad Junction
Muazzampur Narayan Junction – Najibabad Junction (MZM–NBD) railway line: 11 km, double electric broad gauge. 3 stations and 119 trains, Northern Railway.
- Length
- 11 km
- Speed limit
- 110 km/h
- Trains
- 119 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 3
- Muazzampur Narayan Jn MZM 0.0 km
- Fazalpur FZL 5.4 km
- Najibabad Jn NBD 11.2 km
Quick answers
How long is the Muazzampur Narayan Junction – Najibabad Junction line?
The Muazzampur Narayan Junction – Najibabad Junction line is about 11 km long, with 3 stations.
Is the Muazzampur Narayan Junction – Najibabad Junction line electrified?
Yes. The Muazzampur Narayan Junction – Najibabad Junction line is electrified: trains run on electric power from overhead wires.
Is Muazzampur Narayan Junction – Najibabad Junction a single or double line?
The Muazzampur Narayan Junction – Najibabad Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Muazzampur Narayan Junction and Najibabad Junction?
Trains can run at up to 110 km/h between Muazzampur Narayan Junction and Najibabad Junction.
How many trains use the Muazzampur Narayan Junction – Najibabad Junction line?
119 trains run over the Muazzampur Narayan Junction – Najibabad Junction line.