Nadiad Junction – Kanjari Boriyavi Junction
Nadiad Junction – Kanjari Boriyavi Junction (ND–KBRV) railway line: 11 km, double electric broad gauge. 3 stations and 297 trains, Western Railway.
- Length
- 11 km
- Speed limit
- 130 km/h
- Trains
- 297 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 3
- Nadiad Jn ND 0.0 km
- Utarsanda UTD 5.5 km
- Kanjari Boriyavi Jn KBRV 11.0 km
Quick answers
How long is the Nadiad Junction – Kanjari Boriyavi Junction line?
The Nadiad Junction – Kanjari Boriyavi Junction line is about 11 km long, with 3 stations.
Is the Nadiad Junction – Kanjari Boriyavi Junction line electrified?
Yes. The Nadiad Junction – Kanjari Boriyavi Junction line is electrified: trains run on electric power from overhead wires.
Is Nadiad Junction – Kanjari Boriyavi Junction a single or double line?
The Nadiad Junction – Kanjari Boriyavi Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Nadiad Junction and Kanjari Boriyavi Junction?
Trains can run at up to 130 km/h between Nadiad Junction and Kanjari Boriyavi Junction.
How many trains use the Nadiad Junction – Kanjari Boriyavi Junction line?
297 trains run over the Nadiad Junction – Kanjari Boriyavi Junction line.