Nagarsul – Aurangabad
Nagarsul – Aurangabad (NSL–AWB) railway line: 89 km, single electric broad gauge. 32 stations and 58 trains, South Central Railway.
- Length
- 89 km
- Trains
- 58 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- DoublingA second track is being built.
Stations on this line · 32
- Ankai ANKX 0.0 km
- Ankai ANK 1.3 km
- Nagarsul NSL 10.8 km
- Tarur TR 24.8 km
- Rotegaon RGO 38.9 km
- Parsoda PSD 51.2 km
- Karanjgaon KAJG 56.4 km
- Lasur LSR 65.9 km
- Potul POZ 77.8 km
- Daulatabad DLB 87.1 km
- Chhatrapati Sambhaji Nagar CPSN 99.6 km
- AWB AWB 99.6 km
- Mukundwadi Halt MKDD 105.9 km
- Chikalthan CTH 109.6 km
- Karmad KMV 123.8 km
- Gevrai GOI 135.7 km
- Badnapur BDU 143.2 km
- Dinagaon DIQ 155.1 km
- Jalna J 162.3 km
- Sarwari SVD 171.8 km
- Kodi KODI 181.9 km
- Ranjani RNE 193.0 km
- Paradgaon PDG 199.4 km
- Partur PTU 207.0 km
- Usmanpur UPR 216.0 km
- Satuna SCO 225.0 km
- Selu SELU 234.3 km
- Dengli Pimpalgaon DGPP 243.7 km
- Manwath Road MVO 249.2 km
- Devalgaon Avchar DAV 258.4 km
- Pergaon PG 264.4 km
- Parbhani Jn PBN 276.8 km
Quick answers
How long is the Nagarsul – Aurangabad line?
The Nagarsul – Aurangabad line is about 89 km long, with 32 stations.
Is the Nagarsul – Aurangabad line electrified?
Yes. The Nagarsul – Aurangabad line is electrified: trains run on electric power from overhead wires.
Is Nagarsul – Aurangabad a single or double line?
The Nagarsul – Aurangabad line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Nagarsul – Aurangabad line?
58 trains run over the Nagarsul – Aurangabad line.