Nainpur Junction – Kachhpura Junction
Nainpur Junction – Kachhpura Junction (NIR–KEQ) railway line: 114 km, single electric broad gauge. 18 stations and 24 trains, South East Central Railway.
- Length
- 114 km
- Trains
- 24 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 18
- Nainpur Jn NIR 0.0 km
- Jeonara Ph JONR 5.3 km
- Pindrai PDE 12.6 km
- Putarra PRTR 19.9 km
- Nidhani NDNI 27.5 km
- Ghansore GNS 34.9 km
- Binaiki VNK 43.9 km
- Shikara SKY 55.5 km
- Devri P.H. DRPH 62.1 km
- Kaladehi KDHI 66.5 km
- Sukrimangela SOY 69.4 km
- Bargi BUQ 80.3 km
- Charghat Piparia CRE 87.7 km
- Charghat Piparia CGE 92.3 km
- Jamtara Paraswara JPV 95.4 km
- Gwarighat GRG 99.0 km
- Garha GGGS 108.0 km
- Kachhpura Jn KEQ 114.3 km
Quick answers
How long is the Nainpur Junction – Kachhpura Junction line?
The Nainpur Junction – Kachhpura Junction line is about 114 km long, with 18 stations.
Is the Nainpur Junction – Kachhpura Junction line electrified?
Yes. The Nainpur Junction – Kachhpura Junction line is electrified: trains run on electric power from overhead wires.
Is Nainpur Junction – Kachhpura Junction a single or double line?
The Nainpur Junction – Kachhpura Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Nainpur Junction – Kachhpura Junction line?
24 trains run over the Nainpur Junction – Kachhpura Junction line.