RailTribe
Lines
Map
Trains
Line

New Amravati Cabin – Amravati MIDC Freight Yard

New Amravati Cabin – Amravati MIDC Freight Yard (XX-NAVC–AMIY) railway line: 23 km, single electric broad gauge. 4 stations, Central Railway.

Length
23 km
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 4

  1. XX-NAVC XX-NAVC 0.0 km
  2. Amravati MIDC Cabin AMDC 1.4 km
  3. Vitthalapur VTPR 11.8 km
  4. Amravati MIDC Freight Yard AMIY 23.2 km

Quick answers

How long is the New Amravati Cabin – Amravati MIDC Freight Yard line?

The New Amravati Cabin – Amravati MIDC Freight Yard line is about 23 km long, with 4 stations.

Is the New Amravati Cabin – Amravati MIDC Freight Yard line electrified?

Yes. The New Amravati Cabin – Amravati MIDC Freight Yard line is electrified: trains run on electric power from overhead wires.

Is New Amravati Cabin – Amravati MIDC Freight Yard a single or double line?

The New Amravati Cabin – Amravati MIDC Freight Yard line is a single line. Trains in both directions share one track and wait at stations to cross.

Indian railway atlas