RailTribe
Lines
Map
Trains
Line

New Amravati Outer Cabin – Narkher Bypass Cabin

New Amravati Outer Cabin – Narkher Bypass Cabin (YY-NAVO–YY-NRKB) railway line: 134 km, single electric broad gauge. 19 stations and 10 trains, Central Railway.

Length
134 km
Trains
10 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 19

  1. YY-NAVO YY-NAVO 0.0 km
  2. XX-AMIB XX-AMIB 1.1 km
  3. New Amravati NAVI 4.1 km
  4. XX-NAVC XX-NAVC 16.7 km
  5. Walgaon WLGN 17.4 km
  6. Walgaon Outer Cabin WLGC 18.0 km
  7. Shirala SIRL 29.5 km
  8. Chandur Bazar CNDB 40.8 km
  9. Riddhapur RDHR 48.8 km
  10. Kolvihir KLVR 51.8 km
  11. Astegaon ASTG 63.2 km
  12. Morshi MRSH 70.8 km
  13. Shri Kshetra Pala PAAL 77.3 km
  14. Hiwarkhed HKNT 83.6 km
  15. Benoda BNOD 96.5 km
  16. Warud Orange City WOC 106.5 km
  17. Pusla PUSA 115.7 km
  18. Mowad MWAD 127.6 km
  19. YY-NRKB YY-NRKB 134.2 km

Quick answers

How long is the New Amravati Outer Cabin – Narkher Bypass Cabin line?

The New Amravati Outer Cabin – Narkher Bypass Cabin line is about 134 km long, with 19 stations.

Is the New Amravati Outer Cabin – Narkher Bypass Cabin line electrified?

Yes. The New Amravati Outer Cabin – Narkher Bypass Cabin line is electrified: trains run on electric power from overhead wires.

Is New Amravati Outer Cabin – Narkher Bypass Cabin a single or double line?

The New Amravati Outer Cabin – Narkher Bypass Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the New Amravati Outer Cabin – Narkher Bypass Cabin line?

10 trains run over the New Amravati Outer Cabin – Narkher Bypass Cabin line.

Indian railway atlas