New Amravati Outer Cabin – Narkher Bypass Cabin
New Amravati Outer Cabin – Narkher Bypass Cabin (YY-NAVO–YY-NRKB) railway line: 134 km, single electric broad gauge. 19 stations and 10 trains, Central Railway.
- Length
- 134 km
- Trains
- 10 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 19
- YY-NAVO YY-NAVO 0.0 km
- XX-AMIB XX-AMIB 1.1 km
- New Amravati NAVI 4.1 km
- XX-NAVC XX-NAVC 16.7 km
- Walgaon WLGN 17.4 km
- Walgaon Outer Cabin WLGC 18.0 km
- Shirala SIRL 29.5 km
- Chandur Bazar CNDB 40.8 km
- Riddhapur RDHR 48.8 km
- Kolvihir KLVR 51.8 km
- Astegaon ASTG 63.2 km
- Morshi MRSH 70.8 km
- Shri Kshetra Pala PAAL 77.3 km
- Hiwarkhed HKNT 83.6 km
- Benoda BNOD 96.5 km
- Warud Orange City WOC 106.5 km
- Pusla PUSA 115.7 km
- Mowad MWAD 127.6 km
- YY-NRKB YY-NRKB 134.2 km
Quick answers
How long is the New Amravati Outer Cabin – Narkher Bypass Cabin line?
The New Amravati Outer Cabin – Narkher Bypass Cabin line is about 134 km long, with 19 stations.
Is the New Amravati Outer Cabin – Narkher Bypass Cabin line electrified?
Yes. The New Amravati Outer Cabin – Narkher Bypass Cabin line is electrified: trains run on electric power from overhead wires.
Is New Amravati Outer Cabin – Narkher Bypass Cabin a single or double line?
The New Amravati Outer Cabin – Narkher Bypass Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the New Amravati Outer Cabin – Narkher Bypass Cabin line?
10 trains run over the New Amravati Outer Cabin – Narkher Bypass Cabin line.