RailTribe
Lines
Map
Trains
Line

New Barauni Junction – Sahibpur Kamal Junction

New Barauni Junction – Sahibpur Kamal Junction (NBJU–SKJ) railway line: 40 km, double electric broad gauge. 10 stations and 128 trains, East Central Railway.

Length
40 km
Speed limit
110 km/h
Trains
128 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 10

  1. New Barauni Jn NBJU 0.0 km
  2. Bihat Halt BEHT 2.8 km
  3. Tilrath TIL 6.2 km
  4. Singhaul Halt SHHT 9.3 km
  5. Begusarai BGS 13.3 km
  6. Lakho LAK 20.6 km
  7. Danauli Phulwaria DPL 26.1 km
  8. Lakhminia LKN 31.1 km
  9. Sanha Halt SANH 37.0 km
  10. Sahibpur Kamal Jn SKJ 40.2 km

Quick answers

How long is the New Barauni Junction – Sahibpur Kamal Junction line?

The New Barauni Junction – Sahibpur Kamal Junction line is about 40 km long, with 10 stations.

Is the New Barauni Junction – Sahibpur Kamal Junction line electrified?

Yes. The New Barauni Junction – Sahibpur Kamal Junction line is electrified: trains run on electric power from overhead wires.

Is New Barauni Junction – Sahibpur Kamal Junction a single or double line?

The New Barauni Junction – Sahibpur Kamal Junction line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between New Barauni Junction and Sahibpur Kamal Junction?

Trains can run at up to 110 km/h between New Barauni Junction and Sahibpur Kamal Junction.

How many trains use the New Barauni Junction – Sahibpur Kamal Junction line?

128 trains run over the New Barauni Junction – Sahibpur Kamal Junction line.

Indian railway atlas