New Bongaigaon Junction – Abhayapuri
New Bongaigaon Junction – Abhayapuri (NBQ–AYU) railway line: 17 km, double electric broad gauge. 3 stations and 48 trains, Northeast Frontier Railway.
- Length
- 17 km
- Speed limit
- 110 km/h
- Trains
- 48 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 3
- New Bongaigaon Jn NBQ 0.0 km
- Majgaon MZQ 8.4 km
- Abhayapuri AYU 17.4 km
Quick answers
How long is the New Bongaigaon Junction – Abhayapuri line?
The New Bongaigaon Junction – Abhayapuri line is about 17 km long, with 3 stations.
Is the New Bongaigaon Junction – Abhayapuri line electrified?
Yes. The New Bongaigaon Junction – Abhayapuri line is electrified: trains run on electric power from overhead wires.
Is New Bongaigaon Junction – Abhayapuri a single or double line?
The New Bongaigaon Junction – Abhayapuri line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between New Bongaigaon Junction and Abhayapuri?
Trains can run at up to 110 km/h between New Bongaigaon Junction and Abhayapuri.
How many trains use the New Bongaigaon Junction – Abhayapuri line?
48 trains run over the New Bongaigaon Junction – Abhayapuri line.