New Farakka S Cabin – New Farakka B Cabin
New Farakka S Cabin – New Farakka B Cabin (NFKS–NFKB) railway line: 1 km, single electric broad gauge. 2 stations and 6 trains, Eastern Railway.
- Length
- 1 km
- Trains
- 6 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- New Farakka S Cabin NFKS 0.0 km
- New Farakka B Cabin NFKB 0.6 km
Quick answers
How long is the New Farakka S Cabin – New Farakka B Cabin line?
The New Farakka S Cabin – New Farakka B Cabin line is about 1 km long, with 2 stations.
Is the New Farakka S Cabin – New Farakka B Cabin line electrified?
Yes. The New Farakka S Cabin – New Farakka B Cabin line is electrified: trains run on electric power from overhead wires.
Is New Farakka S Cabin – New Farakka B Cabin a single or double line?
The New Farakka S Cabin – New Farakka B Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the New Farakka S Cabin – New Farakka B Cabin line?
6 trains run over the New Farakka S Cabin – New Farakka B Cabin line.