New Majhagawan Phatak – Katangi Khurd Junction
New Majhagawan Phatak – Katangi Khurd Junction (NMWP–KTKD) railway line: 14 km, single broad gauge. 3 stations, West Central Railway.
- Length
- 14 km
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- New LineThis is a new line under construction.
Stations on this line · 3
- New Majhagawan Phatak NMWP 0.0 km
- XX-KMZO XX-KMZO 9.5 km
- Katangi Khurd Jn KTKD 14.0 km
Quick answers
How long is the New Majhagawan Phatak – Katangi Khurd Junction line?
The New Majhagawan Phatak – Katangi Khurd Junction line is about 14 km long, with 3 stations.
Is New Majhagawan Phatak – Katangi Khurd Junction a single or double line?
The New Majhagawan Phatak – Katangi Khurd Junction line is a single line. Trains in both directions share one track and wait at stations to cross.