New Manjhi – Bakulha
New Manjhi – Bakulha (NMHI–BKLA) railway line: 9 km, single electric broad gauge. 15 stations and 87 trains, North Eastern Railway.
- Length
- 9 km
- Trains
- 87 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- DoublingA second track is being built.
Stations on this line · 15
- Chhapra Jn CPR 0.0 km
- Gautamsthan GTST 8.9 km
- Revelganj Ghat Halt RVG 11.1 km
- New Manjhi NMHI 13.8 km
- Manjhi MHT 16.7 km
- Bakulha BKLA 22.4 km
- Suraimanpur SIP 29.1 km
- Dal Chhapra DCP 35.3 km
- Reoti ROI 40.5 km
- Sahatwar STW 48.8 km
- Chhata Aschaura CATA 53.5 km
- Bansdih Road BCD 57.1 km
- Ballia BUI 66.2 km
- Sagarpali SVI 71.3 km
- Phephna Jn PEP 76.3 km
Quick answers
How long is the New Manjhi – Bakulha line?
The New Manjhi – Bakulha line is about 9 km long, with 15 stations.
Is the New Manjhi – Bakulha line electrified?
Yes. The New Manjhi – Bakulha line is electrified: trains run on electric power from overhead wires.
Is New Manjhi – Bakulha a single or double line?
The New Manjhi – Bakulha line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the New Manjhi – Bakulha line?
87 trains run over the New Manjhi – Bakulha line.