Nimpura Through Yard – Gokulpur
Nimpura Through Yard – Gokulpur (NPTY–GKL) railway line: 10 km, single electric broad gauge. 4 stations and 27 trains, South Eastern Railway.
- Length
- 10 km
- Speed limit
- 110 km/h
- Trains
- 27 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 4
- Hijli HIJ 0.0 km
- Nimpura Marshalling Yard NMPY 5.5 km
- Nimpura Through Yard NPTY 5.6 km
- Gokulpur GKL 15.3 km
Quick answers
How long is the Nimpura Through Yard – Gokulpur line?
The Nimpura Through Yard – Gokulpur line is about 10 km long, with 4 stations.
Is the Nimpura Through Yard – Gokulpur line electrified?
Yes. The Nimpura Through Yard – Gokulpur line is electrified: trains run on electric power from overhead wires.
Is Nimpura Through Yard – Gokulpur a single or double line?
The Nimpura Through Yard – Gokulpur line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Nimpura Through Yard and Gokulpur?
Trains can run at up to 110 km/h between Nimpura Through Yard and Gokulpur.
How many trains use the Nimpura Through Yard – Gokulpur line?
27 trains run over the Nimpura Through Yard – Gokulpur line.