Noh Bachhamdi – Achhnera Bypass A Cabin
Noh Bachhamdi – Achhnera Bypass A Cabin (NHB–YY-AHA) railway line: 19 km, single electric broad gauge. 5 stations and 71 trains, North Central Railway.
- Length
- 19 km
- Speed limit
- 110 km/h
- Trains
- 71 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- DoublingA second track is being built.
Stations on this line · 5
- Bharatpur Jn BTE 0.0 km
- Noh Bachhamdi NHB 6.7 km
- Ikran IK 12.0 km
- Chiksana CIK 17.6 km
- YY-AHA YY-AHA 25.6 km
Quick answers
How long is the Noh Bachhamdi – Achhnera Bypass A Cabin line?
The Noh Bachhamdi – Achhnera Bypass A Cabin line is about 19 km long, with 5 stations.
Is the Noh Bachhamdi – Achhnera Bypass A Cabin line electrified?
Yes. The Noh Bachhamdi – Achhnera Bypass A Cabin line is electrified: trains run on electric power from overhead wires.
Is Noh Bachhamdi – Achhnera Bypass A Cabin a single or double line?
The Noh Bachhamdi – Achhnera Bypass A Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Noh Bachhamdi and Achhnera Bypass A Cabin?
Trains can run at up to 110 km/h between Noh Bachhamdi and Achhnera Bypass A Cabin.
How many trains use the Noh Bachhamdi – Achhnera Bypass A Cabin line?
71 trains run over the Noh Bachhamdi – Achhnera Bypass A Cabin line.