NSCB Junction Gomoh – Chandrapura Junction
NSCB Junction Gomoh – Chandrapura Junction (GMO–CRP) railway line: 17 km, double electric broad gauge. 3 stations and 45 trains, East Central Railway.
- Length
- 17 km
- Trains
- 45 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 3
- NSCB Jn Gomoh GMO 0.0 km
- Telo TELO 9.3 km
- Chandrapura Jn CRP 16.9 km
Quick answers
How long is the NSCB Junction Gomoh – Chandrapura Junction line?
The NSCB Junction Gomoh – Chandrapura Junction line is about 17 km long, with 3 stations.
Is the NSCB Junction Gomoh – Chandrapura Junction line electrified?
Yes. The NSCB Junction Gomoh – Chandrapura Junction line is electrified: trains run on electric power from overhead wires.
Is NSCB Junction Gomoh – Chandrapura Junction a single or double line?
The NSCB Junction Gomoh – Chandrapura Junction line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the NSCB Junction Gomoh – Chandrapura Junction line?
45 trains run over the NSCB Junction Gomoh – Chandrapura Junction line.