NSCB Junction Gomoh – Nichitpur
NSCB Junction Gomoh – Nichitpur (GMO–NPJE) railway line: 15 km, double electric broad gauge. 4 stations and 91 trains, East Central Railway.
- Length
- 15 km
- Trains
- 91 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 4
- NSCB Jn Gomoh GMO 0.0 km
- Ramakunda Halt RIBP 5.5 km
- Matari MRQ 9.5 km
- Nichitpur NPJE 14.8 km
Quick answers
How long is the NSCB Junction Gomoh – Nichitpur line?
The NSCB Junction Gomoh – Nichitpur line is about 15 km long, with 4 stations.
Is the NSCB Junction Gomoh – Nichitpur line electrified?
Yes. The NSCB Junction Gomoh – Nichitpur line is electrified: trains run on electric power from overhead wires.
Is NSCB Junction Gomoh – Nichitpur a single or double line?
The NSCB Junction Gomoh – Nichitpur line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the NSCB Junction Gomoh – Nichitpur line?
91 trains run over the NSCB Junction Gomoh – Nichitpur line.