Pagidipalli Junction – Kazipet Junction
Pagidipalli Junction – Kazipet Junction (PGDP–KZJ) railway line: 95 km, double electric broad gauge. 14 stations and 145 trains, South Central Railway.
- Length
- 95 km
- Speed limit
- 130 km/h
- Trains
- 145 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 14
- Pagidipalli Jn PGDP 0.0 km
- Bhongir BG 10.1 km
- Yadadri YADD 16.3 km
- Wangapalli WP 22.4 km
- Aler ALER 32.9 km
- Pembarti PBP 41.8 km
- Jangaon ZN 47.2 km
- YSPM YSPM 52.8 km
- Raghunathpalli RGP 58.7 km
- Ippuguda IPG 67.9 km
- Ghanpur GNP 75.3 km
- Nashkal NSKL 82.0 km
- Pindial PQL 87.3 km
- Kazipet Jn KZJ 95.3 km
Quick answers
How long is the Pagidipalli Junction – Kazipet Junction line?
The Pagidipalli Junction – Kazipet Junction line is about 95 km long, with 14 stations.
Is the Pagidipalli Junction – Kazipet Junction line electrified?
Yes. The Pagidipalli Junction – Kazipet Junction line is electrified: trains run on electric power from overhead wires.
Is Pagidipalli Junction – Kazipet Junction a single or double line?
The Pagidipalli Junction – Kazipet Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Pagidipalli Junction and Kazipet Junction?
Trains can run at up to 130 km/h between Pagidipalli Junction and Kazipet Junction.
How many trains use the Pagidipalli Junction – Kazipet Junction line?
145 trains run over the Pagidipalli Junction – Kazipet Junction line.