RailTribe
Lines
Map
Trains
Line

Panchdeori Halt – Bhatni Junction

Panchdeori Halt – Bhatni Junction (PCDR–BTT) railway line: 36 km, single broad gauge. 7 stations, North Eastern Railway.

Length
36 km
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.
Work
New LineThis is a new line under construction.

Stations on this line · 7

  1. Hathua Jn HTW 0.0 km
  2. Lain Bazaar LB 11.9 km
  3. Salar Khurd SRKR 14.0 km
  4. Phulwaria PLWR 17.0 km
  5. Bathua Bazar BHBR 21.0 km
  6. Panchdeori Halt PCDR 31.1 km
  7. Bhatni Jn BTT 67.6 km

Quick answers

How long is the Panchdeori Halt – Bhatni Junction line?

The Panchdeori Halt – Bhatni Junction line is about 36 km long, with 7 stations.

Is Panchdeori Halt – Bhatni Junction a single or double line?

The Panchdeori Halt – Bhatni Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

Indian railway atlas