Panchdeori Halt – Bhatni Junction
Panchdeori Halt – Bhatni Junction (PCDR–BTT) railway line: 36 km, single broad gauge. 7 stations, North Eastern Railway.
- Length
- 36 km
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- New LineThis is a new line under construction.
Stations on this line · 7
- Hathua Jn HTW 0.0 km
- Lain Bazaar LB 11.9 km
- Salar Khurd SRKR 14.0 km
- Phulwaria PLWR 17.0 km
- Bathua Bazar BHBR 21.0 km
- Panchdeori Halt PCDR 31.1 km
- Bhatni Jn BTT 67.6 km
Quick answers
How long is the Panchdeori Halt – Bhatni Junction line?
The Panchdeori Halt – Bhatni Junction line is about 36 km long, with 7 stations.
Is Panchdeori Halt – Bhatni Junction a single or double line?
The Panchdeori Halt – Bhatni Junction line is a single line. Trains in both directions share one track and wait at stations to cross.