Patel Nagar – Dayabasti Bypass A Cabin
Patel Nagar – Dayabasti Bypass A Cabin (PTNR–DBSC) railway line: 3 km, double electric broad gauge. 2 stations and 8 trains, Northern Railway.
- Length
- 3 km
- Trains
- 8 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 2
- Patel Nagar PTNR 0.0 km
- Dayabasti Bypass A Cabin DBSC 2.7 km
Quick answers
How long is the Patel Nagar – Dayabasti Bypass A Cabin line?
The Patel Nagar – Dayabasti Bypass A Cabin line is about 3 km long, with 2 stations.
Is the Patel Nagar – Dayabasti Bypass A Cabin line electrified?
Yes. The Patel Nagar – Dayabasti Bypass A Cabin line is electrified: trains run on electric power from overhead wires.
Is Patel Nagar – Dayabasti Bypass A Cabin a single or double line?
The Patel Nagar – Dayabasti Bypass A Cabin line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the Patel Nagar – Dayabasti Bypass A Cabin line?
8 trains run over the Patel Nagar – Dayabasti Bypass A Cabin line.