Petlad Junction – Anand Junction
Petlad Junction – Anand Junction (PTD–ANND) railway line: 22 km, single electric broad gauge. 6 stations and 16 trains, Western Railway.
- Length
- 22 km
- Speed limit
- 75 km/h
- Trains
- 16 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 6
- Petlad Jn PTD 0.0 km
- Bhatiel BHAL 5.7 km
- Agas AGAS 9.3 km
- Karamsad KRYR 14.2 km
- Vallabh Vidyanagar VLYN 16.0 km
- Anand Jn ANND 21.8 km
Quick answers
How long is the Petlad Junction – Anand Junction line?
The Petlad Junction – Anand Junction line is about 22 km long, with 6 stations.
Is the Petlad Junction – Anand Junction line electrified?
Yes. The Petlad Junction – Anand Junction line is electrified: trains run on electric power from overhead wires.
Is Petlad Junction – Anand Junction a single or double line?
The Petlad Junction – Anand Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Petlad Junction and Anand Junction?
Trains can run at up to 75 km/h between Petlad Junction and Anand Junction.
How many trains use the Petlad Junction – Anand Junction line?
16 trains run over the Petlad Junction – Anand Junction line.