Phulera Junction – Jaipur Junction
Phulera Junction – Jaipur Junction (FL–JP) railway line: 55 km, double electric broad gauge. 10 stations and 197 trains, North Western Railway.
- Length
- 55 km
- Speed limit
- 130 km/h
- Trains
- 197 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 10
- Phulera Jn FL 0.0 km
- Hirnoda HDA 8.3 km
- Dhinda DHND 12.5 km
- Asalpur Jobner JOB 17.9 km
- Bobas BOBS 25.4 km
- Sheo Singh Pura SHNX 32.3 km
- Dhanakya DNK 36.1 km
- Bindayaka BDYK 40.7 km
- Kanakpura KKU 45.8 km
- Jaipur Jn JP 54.6 km
Quick answers
How long is the Phulera Junction – Jaipur Junction line?
The Phulera Junction – Jaipur Junction line is about 55 km long, with 10 stations.
Is the Phulera Junction – Jaipur Junction line electrified?
Yes. The Phulera Junction – Jaipur Junction line is electrified: trains run on electric power from overhead wires.
Is Phulera Junction – Jaipur Junction a single or double line?
The Phulera Junction – Jaipur Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Phulera Junction and Jaipur Junction?
Trains can run at up to 130 km/h between Phulera Junction and Jaipur Junction.
How many trains use the Phulera Junction – Jaipur Junction line?
197 trains run over the Phulera Junction – Jaipur Junction line.