Pipraich – Kaptanganj Junction
Pipraich – Kaptanganj Junction (PPC–CPJ) railway line: 20 km, single electric broad gauge. 6 stations and 89 trains, North Eastern Railway.
- Length
- 20 km
- Speed limit
- 110 km/h
- Trains
- 89 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- DoublingA second track is being built.
Stations on this line · 6
- Gorakhpur Cantt. GKC 0.0 km
- Unaula UNLA 7.1 km
- Pipraich PPC 15.3 km
- Mahuawa Khurd MUUA 22.6 km
- Bodarwar BBW 26.9 km
- Kaptanganj Jn CPJ 34.9 km
Quick answers
How long is the Pipraich – Kaptanganj Junction line?
The Pipraich – Kaptanganj Junction line is about 20 km long, with 6 stations.
Is the Pipraich – Kaptanganj Junction line electrified?
Yes. The Pipraich – Kaptanganj Junction line is electrified: trains run on electric power from overhead wires.
Is Pipraich – Kaptanganj Junction a single or double line?
The Pipraich – Kaptanganj Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Pipraich and Kaptanganj Junction?
Trains can run at up to 110 km/h between Pipraich and Kaptanganj Junction.
How many trains use the Pipraich – Kaptanganj Junction line?
89 trains run over the Pipraich – Kaptanganj Junction line.