Puntamba Junction – Shirdi Terminus
Puntamba Junction – Shirdi Terminus (PB–SNSI) railway line: 17 km, single electric broad gauge. 3 stations and 30 trains, Central Railway.
- Length
- 17 km
- Speed limit
- 110 km/h
- Trains
- 30 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 3
- Puntamba Jn PB 0.0 km
- XX-PBC XX-PBC 1.4 km
- Shirdi Trm SNSI 16.5 km
Quick answers
How long is the Puntamba Junction – Shirdi Terminus line?
The Puntamba Junction – Shirdi Terminus line is about 17 km long, with 3 stations.
Is the Puntamba Junction – Shirdi Terminus line electrified?
Yes. The Puntamba Junction – Shirdi Terminus line is electrified: trains run on electric power from overhead wires.
Is Puntamba Junction – Shirdi Terminus a single or double line?
The Puntamba Junction – Shirdi Terminus line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Puntamba Junction and Shirdi Terminus?
Trains can run at up to 110 km/h between Puntamba Junction and Shirdi Terminus.
How many trains use the Puntamba Junction – Shirdi Terminus line?
30 trains run over the Puntamba Junction – Shirdi Terminus line.