Rangiya Junction – Pathsala
Rangiya Junction – Pathsala (RNY–PBL) railway line: 44 km, double electric broad gauge. 16 stations and 89 trains, Northeast Frontier Railway.
- Length
- 44 km
- Speed limit
- 110 km/h
- Trains
- 89 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 16
- Rangiya Jn RNY 0.0 km
- Ghograpar GOE 7.9 km
- Nalbari NLV 16.6 km
- Kaithalkuchi KTCH 26.7 km
- Tihu TIHU 34.2 km
- Nizsariha Halt NSRH 39.1 km
- Pathsala PBL 43.7 km
- Sorupeta SPQ 53.7 km
- Guagachha GSA 59.6 km
- Barpeta Road BPRD 64.9 km
- Sorbhog SBE 72.8 km
- Patiladaha PTLD 81.7 km
- Bijni BJF 91.9 km
- Chaprakata CPQ 101.3 km
- Bongaigaon BNGN 106.6 km
- New Bongaigaon Jn NBQ 109.1 km
Quick answers
How long is the Rangiya Junction – Pathsala line?
The Rangiya Junction – Pathsala line is about 44 km long, with 16 stations.
Is the Rangiya Junction – Pathsala line electrified?
Yes. The Rangiya Junction – Pathsala line is electrified: trains run on electric power from overhead wires.
Is Rangiya Junction – Pathsala a single or double line?
The Rangiya Junction – Pathsala line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Rangiya Junction and Pathsala?
Trains can run at up to 110 km/h between Rangiya Junction and Pathsala.
How many trains use the Rangiya Junction – Pathsala line?
89 trains run over the Rangiya Junction – Pathsala line.