RailTribe
Lines
Map
Trains
Line

Rupsa Junction – Dantan

Rupsa Junction – Dantan (ROP–DNT) railway line: 46 km, double electric broad gauge. 15 stations and 171 trains, South Eastern Railway.

Length
46 km
Speed limit
130 km/h
Trains
171 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.
Work
TriplingA third track is being built.

Stations on this line · 15

  1. Rupsa Jn ROP 0.0 km
  2. Nuagan Mayurbhanj Road NMBR 5.6 km
  3. Basta BTS 10.0 km
  4. Amarda Road ARD 15.5 km
  5. Rajghat RGT 21.9 km
  6. Jaleswar JER 29.6 km
  7. Lakshannath Road LXD 35.6 km
  8. Angua P.H. AGV 41.7 km
  9. Dantan DNT 46.1 km
  10. Nekurseni NSI 54.7 km
  11. Belda BLDA 62.8 km
  12. Bakhrabad VKD 68.8 km
  13. Narayangarh NYA 75.2 km
  14. Benapur BPE 86.3 km
  15. Hijli HIJ 94.3 km

Quick answers

How long is the Rupsa Junction – Dantan line?

The Rupsa Junction – Dantan line is about 46 km long, with 15 stations.

Is the Rupsa Junction – Dantan line electrified?

Yes. The Rupsa Junction – Dantan line is electrified: trains run on electric power from overhead wires.

Is Rupsa Junction – Dantan a single or double line?

The Rupsa Junction – Dantan line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Rupsa Junction and Dantan?

Trains can run at up to 130 km/h between Rupsa Junction and Dantan.

How many trains use the Rupsa Junction – Dantan line?

171 trains run over the Rupsa Junction – Dantan line.

Indian railway atlas