Rupsa Junction – Khantapara
Rupsa Junction – Khantapara (ROP–KHF) railway line: 33 km, double electric broad gauge. 13 stations and 173 trains, South Eastern Railway.
- Length
- 33 km
- Speed limit
- 130 km/h
- Trains
- 173 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
- Work
- TriplingA third track is being built.
Stations on this line · 13
- Rupsa Jn ROP 0.0 km
- Haldipada HIP 6.1 km
- Tikirapal PH TKPL 12.9 km
- Baleshwar BLS 17.8 km
- Nilgiri Road NGRD 28.5 km
- Khantapara KHF 33.3 km
- Panpana PH PNPN 38.3 km
- Bahanaga Bazar BNBR 42.7 km
- Soro SORO 51.3 km
- Sabira SZZ 60.0 km
- Markona MKO 66.0 km
- Ranital RNTL 72.5 km
- Ranital Link Jn Cabin RLJC 75.4 km
Quick answers
How long is the Rupsa Junction – Khantapara line?
The Rupsa Junction – Khantapara line is about 33 km long, with 13 stations.
Is the Rupsa Junction – Khantapara line electrified?
Yes. The Rupsa Junction – Khantapara line is electrified: trains run on electric power from overhead wires.
Is Rupsa Junction – Khantapara a single or double line?
The Rupsa Junction – Khantapara line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Rupsa Junction and Khantapara?
Trains can run at up to 130 km/h between Rupsa Junction and Khantapara.
How many trains use the Rupsa Junction – Khantapara line?
173 trains run over the Rupsa Junction – Khantapara line.