RailTribe
Lines
Map
Trains
Line

Sabarmati A Cabin – Ahmedabad Junction

Sabarmati A Cabin – Ahmedabad Junction (SBTA–ADI) railway line: 4 km, triple electric broad gauge. 10 stations and 216 trains, Western Railway.

Length
4 km
Trains
216 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Triple lineAn extra track that lets more trains run.

Stations on this line · 10

  1. Kalol Jn KLL 0.0 km
  2. Saij Sertha Road SHRD 4.3 km
  3. Khodiyar KHDB 10.9 km
  4. Chandkhera Road CDK 16.2 km
  5. Sabarmati D Cabin SBID 17.4 km
  6. Kali Road KLRD 18.4 km
  7. Sabarmati Jn SBI 21.0 km
  8. Sabarmati BG SBIB 21.0 km
  9. Sabarmati A Cabin SBTA 22.9 km
  10. Ahmedabad Jn ADI 26.9 km

Quick answers

How long is the Sabarmati A Cabin – Ahmedabad Junction line?

The Sabarmati A Cabin – Ahmedabad Junction line is about 4 km long, with 10 stations.

Is the Sabarmati A Cabin – Ahmedabad Junction line electrified?

Yes. The Sabarmati A Cabin – Ahmedabad Junction line is electrified: trains run on electric power from overhead wires.

Is Sabarmati A Cabin – Ahmedabad Junction a single or double line?

The Sabarmati A Cabin – Ahmedabad Junction line is a triple line. An extra track that lets more trains run.

How many trains use the Sabarmati A Cabin – Ahmedabad Junction line?

216 trains run over the Sabarmati A Cabin – Ahmedabad Junction line.

Indian railway atlas