Sabdalpur Junction – Sahibpur Kamal Junction
Sabdalpur Junction – Sahibpur Kamal Junction (SBDP–SKJ) railway line: 5 km, single electric broad gauge. 2 stations and 10 trains, East Central Railway.
- Length
- 5 km
- Trains
- 10 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- Sabdalpur Jn SBDP 0.0 km
- Sahibpur Kamal Jn SKJ 5.4 km
Quick answers
How long is the Sabdalpur Junction – Sahibpur Kamal Junction line?
The Sabdalpur Junction – Sahibpur Kamal Junction line is about 5 km long, with 2 stations.
Is the Sabdalpur Junction – Sahibpur Kamal Junction line electrified?
Yes. The Sabdalpur Junction – Sahibpur Kamal Junction line is electrified: trains run on electric power from overhead wires.
Is Sabdalpur Junction – Sahibpur Kamal Junction a single or double line?
The Sabdalpur Junction – Sahibpur Kamal Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Sabdalpur Junction – Sahibpur Kamal Junction line?
10 trains run over the Sabdalpur Junction – Sahibpur Kamal Junction line.