Sadulpur Bypass Cabin – Loharu Junction
Sadulpur Bypass Cabin – Loharu Junction (YY-SDLB–LHU) railway line: 48 km, single electric broad gauge. 9 stations and 40 trains, North Western Railway.
- Length
- 48 km
- Trains
- 40 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 9
- YY-SDLB YY-SDLB 0.0 km
- Kandhran KDHN 7.1 km
- Harpalu HR 11.1 km
- Bewar Bhojan BWBN 18.3 km
- Gugalwa Kirtan Halt GLKN 22.3 km
- Rampura Beri RMB 26.9 km
- Parvezpur PVZ 35.4 km
- Kushal Pura KLSP 40.5 km
- Loharu Jn LHU 47.6 km
Quick answers
How long is the Sadulpur Bypass Cabin – Loharu Junction line?
The Sadulpur Bypass Cabin – Loharu Junction line is about 48 km long, with 9 stations.
Is the Sadulpur Bypass Cabin – Loharu Junction line electrified?
Yes. The Sadulpur Bypass Cabin – Loharu Junction line is electrified: trains run on electric power from overhead wires.
Is Sadulpur Bypass Cabin – Loharu Junction a single or double line?
The Sadulpur Bypass Cabin – Loharu Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Sadulpur Bypass Cabin – Loharu Junction line?
40 trains run over the Sadulpur Bypass Cabin – Loharu Junction line.