Sadulpur Bypass Cabin – Sadulpur Junction
Sadulpur Bypass Cabin – Sadulpur Junction (YY-SDLB–SDLP) railway line: 2 km, single electric broad gauge. 2 stations and 40 trains, North Western Railway.
- Length
- 2 km
- Trains
- 40 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- YY-SDLB YY-SDLB 0.0 km
- Sadulpur Jn SDLP 2.3 km
Quick answers
How long is the Sadulpur Bypass Cabin – Sadulpur Junction line?
The Sadulpur Bypass Cabin – Sadulpur Junction line is about 2 km long, with 2 stations.
Is the Sadulpur Bypass Cabin – Sadulpur Junction line electrified?
Yes. The Sadulpur Bypass Cabin – Sadulpur Junction line is electrified: trains run on electric power from overhead wires.
Is Sadulpur Bypass Cabin – Sadulpur Junction a single or double line?
The Sadulpur Bypass Cabin – Sadulpur Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Sadulpur Bypass Cabin – Sadulpur Junction line?
40 trains run over the Sadulpur Bypass Cabin – Sadulpur Junction line.