Sahibabad Junction – Anand Vihar Terminal
Sahibabad Junction – Anand Vihar Terminal (SBB–ANVT) railway line: 6 km, double electric broad gauge. 2 stations and 149 trains, Northern Railway.
- Length
- 6 km
- Trains
- 149 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 2
- Sahibabad Jn SBB 0.0 km
- Anand Vihar Trm ANVT 5.8 km
Quick answers
How long is the Sahibabad Junction – Anand Vihar Terminal line?
The Sahibabad Junction – Anand Vihar Terminal line is about 6 km long, with 2 stations.
Is the Sahibabad Junction – Anand Vihar Terminal line electrified?
Yes. The Sahibabad Junction – Anand Vihar Terminal line is electrified: trains run on electric power from overhead wires.
Is Sahibabad Junction – Anand Vihar Terminal a single or double line?
The Sahibabad Junction – Anand Vihar Terminal line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the Sahibabad Junction – Anand Vihar Terminal line?
149 trains run over the Sahibabad Junction – Anand Vihar Terminal line.