Sahibabad Junction – Ghaziabad Junction
Sahibabad Junction – Ghaziabad Junction (SBB–GZB) railway line: 7 km, quadruple electric broad gauge. 2 stations and 492 trains, Northern Railway.
- Length
- 7 km
- Trains
- 492 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Quadruple lineTwo tracks each way, found on the busiest routes.
Stations on this line · 2
- Sahibabad Jn SBB 0.0 km
- Ghaziabad Jn GZB 6.8 km
Quick answers
How long is the Sahibabad Junction – Ghaziabad Junction line?
The Sahibabad Junction – Ghaziabad Junction line is about 7 km long, with 2 stations.
Is the Sahibabad Junction – Ghaziabad Junction line electrified?
Yes. The Sahibabad Junction – Ghaziabad Junction line is electrified: trains run on electric power from overhead wires.
Is Sahibabad Junction – Ghaziabad Junction a single or double line?
The Sahibabad Junction – Ghaziabad Junction line is a quadruple line. Two tracks each way, found on the busiest routes.
How many trains use the Sahibabad Junction – Ghaziabad Junction line?
492 trains run over the Sahibabad Junction – Ghaziabad Junction line.