Samuktala Road Junction – New Cooch Behar
Samuktala Road Junction – New Cooch Behar (SMTA–NCB) railway line: 29 km, double electric broad gauge. 4 stations and 111 trains, Northeast Frontier Railway.
- Length
- 29 km
- Speed limit
- 110 km/h
- Trains
- 111 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 4
- Samuktala Road Jn SMTA 0.0 km
- New Alipurduar NOQ 10.4 km
- New Baneswar NBS 21.4 km
- New Cooch Behar NCB 29.2 km
Quick answers
How long is the Samuktala Road Junction – New Cooch Behar line?
The Samuktala Road Junction – New Cooch Behar line is about 29 km long, with 4 stations.
Is the Samuktala Road Junction – New Cooch Behar line electrified?
Yes. The Samuktala Road Junction – New Cooch Behar line is electrified: trains run on electric power from overhead wires.
Is Samuktala Road Junction – New Cooch Behar a single or double line?
The Samuktala Road Junction – New Cooch Behar line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Samuktala Road Junction and New Cooch Behar?
Trains can run at up to 110 km/h between Samuktala Road Junction and New Cooch Behar.
How many trains use the Samuktala Road Junction – New Cooch Behar line?
111 trains run over the Samuktala Road Junction – New Cooch Behar line.